Technology Offerings

Balanced Lift Bridge Method Cuts Costs and Boosts Efficiency

The new bridge construction method consists in building the bridge girders in a vertical position and in rotating the bridge girders into the final horizontal position. The span of the bridge girders is reduced by the compression struts, which enables considerable savings in construction materials.

Further information: PDF

Wissenstransferzentrum Ost (WTZ Ost)
Phone: +43 1 401 60 25 202

Contact
Dr. Michael Hoschitz

As Germany's association of technology- and patenttransfer agencies TechnologieAllianz e.V. is offering businesses access to the entire range of innovative research results of almost all German universities and numerous non-university research institutions. More than 2000 technology offers of 14 branches are beeing made accessable to businesses in order to assure your advance on the market. At www.technologieallianz.de a free, fast and non-bureaucratic access to all further offers of the German research landscape is offered to our members aiming to sucessfully transfer technologies.

Comments (0)

Write a comment